References Technical library
Technical references
- Technical reference
What the literature actually says about container data centers
Eleven open-access papers that back the claims on this site — AI power demand, the US data-center footprint, cooling-chain thermodynamics, and PUE benchmarks — with DOIs and what each one supports.
- Technical reference
The Pod Is Now an NVIDIA Product
With DSX POD, NVIDIA standardized the factory-built container AI factory — liquid-cooled, 800VDC, GPUs included. For a seller of empty pods that is endorsement and deadline at once: the form factor is validated, the generational window is closing, and the customers NVIDIA cannot serve are exactly ours.
- Solution brief
Plan A — The H200 Air-Cooled Row, Spec'd
Two 8-GPU H200 servers per cabinet, ~21 kW IT, sealed cold aisle, fluorine-pump free cooling. The full working paper: per-layer sizing, power chain, honest gaps, kill condition.
- Solution brief
Plan B — The B300 Liquid-Cooled Row, Spec'd
Four 8-GPU B300 servers per cabinet, ~55 kW IT, cold plates, fluorine-to-water CDU, dry coolers. The full working paper: loop math, CDU sizing, power chain, kill condition.
- Product brief
How to spec and price a container data center (2026)
A customer-facing whitepaper: two container products (air / liquid), four chip configurations (H200 / B300 in each), per-container GPU counts, and a three-line estimate you can run from your GPU count. Infrastructure capex only, every assumption labeled.
- Solution brief
The Three-Layer Waterfall: Megawatts, GPU-Hours, Tokens
One megawatt, three revenue layers: $2.3M of rent, $25M of GPU-hours, unbounded tokens. Revenue scales 10× and volatility 100× — we hold the only layer with a signed lease.
- Solution brief
Three Ways to Land a Megawatt in Texas: Retrofit, Factory, or Mine
Planning scenarios, not executed projects: same state, three modeled verdicts — one PROCEED, two CONDITIONAL — and the difference is inherited power, exit timing, and retrofit scope.
- Product brief
Power In, Servers In, Revenue Out: The Turnkey Pod, Spec'd
A 40-ft container with the whole chain factory-installed. The feeder math, the two cooling tiers, and why the critical path is paperwork, not steel.
- Technical reference
Air-Cooled B300 Is Not a Compromise
The 1,100 W wall is a form-factor decision, not a chip limit. Four tier-1 OEMs ship air-cooled HGX B300; the performance tax is single-digit; and the schedule risk you avoid is measured in slipped quarters.
- Technical reference
The Day the Market Priced the GPU Layer
October 14, 2026: CoreWeave's worst day as a public company — bonds at distressed yields, the neocloud model repriced. Live market evidence for why we hold the infrastructure layer and let someone else own the GPUs.
- Technical reference
From Signature to Power Bill: The Pod Delivery Playbook
The process document for a FDC-P40 engagement — what happens between signature and first power bill, the tests a pod passes before it ever sees a truck, and the site works that run in parallel.
- Technical reference
Behind the Badge: Reading a Turnkey Brochure Like a Supplier
ABB and Schneider logos on a Chinese turnkey data center are usually export white-labeling. How to verify who actually made the hardware.
- Technical reference
The Real Cost of a Modular Megawatt: Prefab vs US-Built
Offshore-prefabricated container data centers land at $3.3–4.9M per MW. The arbitrage multiple, the payback math, and the honest counterpoint.
- Technical reference
Power Is the Asset: The Delay Tax on Late Megawatts
A 100 MW data center delivered late burns ~$1B in delay tax. Why energized capacity — not concrete — is the scarce input.
Methodology Model assumptions, on the record
The verdicts and IRRs across these documents ride on a small set of assumptions. Some are market benchmarks; some are model estimates with no public data to check against. House rule: the second kind gets labeled, not hidden. The load-bearing ones:
| Assumption | Value | Confidence | Why it matters |
|---|---|---|---|
| Revenue ramp curve | 45 / 70 / 85 / 92 / 92% of steady state, years 1–5 | Estimate — no industry-standard ramp curve exists | Every IRR and payback figure depends on it |
| Exit anchor | $13.3M/MW stabilized | Low — no first-hand Texas comps (stabilized band $8–21M) | All build-to-sell exit IRRs |
| Pod FOB BOM | $0.8–1.3M/MW·IT | Estimate — no public FOB quotes for AI pods; modeled from component pricing | The base of the price ladder |
| Wholesale rent | $190–195/kW/mo base | Benchmark (CBRE 2025); bull $240–260 / bear $140–150 | The first swing factor in every verdict |
| Import duty | Included in the landed bands | Policy variable — classified per order | priced, not engineered away |
| Market size (third-party demand anchor) | $29.04B (2024) → $75.77B (2030), 17.4% CAGR | Benchmark — Grand View Research, whole-market basis | Context for the 2–3-year shortage-window thesis |
Scenario figures are reproducible from the model; anything marked est. or low-confidence is an assumption you should challenge. If you hold better data than a row above, we want it.