Technical references

The working documents behind our quotes — product briefs, cost models, and solution analyses. Every low-confidence figure is flagged inline.

Methodology Model assumptions, on the record

The verdicts and IRRs across these documents ride on a small set of assumptions. Some are market benchmarks; some are model estimates with no public data to check against. House rule: the second kind gets labeled, not hidden. The load-bearing ones:

AssumptionValueConfidenceWhy it matters
Revenue ramp curve45 / 70 / 85 / 92 / 92% of steady state, years 1–5Estimate — no industry-standard ramp curve existsEvery IRR and payback figure depends on it
Exit anchor$13.3M/MW stabilizedLow — no first-hand Texas comps (stabilized band $8–21M)All build-to-sell exit IRRs
Pod FOB BOM$0.8–1.3M/MW·ITEstimate — no public FOB quotes for AI pods; modeled from component pricingThe base of the price ladder
Wholesale rent$190–195/kW/mo baseBenchmark (CBRE 2025); bull $240–260 / bear $140–150The first swing factor in every verdict
Import dutyIncluded in the landed bandsPolicy variable — classified per orderpriced, not engineered away
Market size (third-party demand anchor)$29.04B (2024) → $75.77B (2030), 17.4% CAGRBenchmark — Grand View Research, whole-market basisContext for the 2–3-year shortage-window thesis

Scenario figures are reproducible from the model; anything marked est. or low-confidence is an assumption you should challenge. If you hold better data than a row above, we want it.