This is the working paper for Plan A of the three-chain modular floor: an air-cooled row built around the NVIDIA HGX H200 8-GPU server. Every number carries its source; every estimate is labeled. Companion paper: Plan B — the B300 liquid-cooled row.

Product layer: this is the per-chip working paper. The shippable product is the FDC-P40-AC air-cooled container (both chip configs, per-container GPU counts).

Working papers (project repo): docs/pod-research/02-cooling-approaches-review.md §2 (sizing derivation), §2.5 (open items), 01-model-anatomy.md (topology source). The web page and the papers are one deliverable — the papers carry the confidence labels the page summarizes.

The load

  • NVIDIA H200 SXM: 700 W TDP per GPU (NVIDIA public spec). 8 GPUs = 5.6 kW.
  • Whole-server input (CPUs, memory, NICs, fans, PSU loss): ~10.5 kW — the midpoint of the 9.5–12 kW nameplate band across current OEM 8-way H200 systems. Estimate: confirm against the selected OEM’s nameplate before ordering.
  • Deployment: 2 servers per 42U cabinet = ~21 kW IT/cabinet.
  • Airflow at ΔT 13 K through a sealed cold aisle: ~21 kW ÷ (1.2 kg/m³ × 1.006 kJ/kg·K × 13 K) ≈ 1.34 m³/s per cabinet.

The cooling chain (Zone A)

LayerEquipmentSizingRedundancy
CabinetSealed cold aisle, ≥70% open rear doors≥1.34 m³/s/cabinet—
Row assist (optional)Backplane fan-wall, water coil10–30 kW/cabinet classFan N+1
Row primaryFluorine-pump multi (vendor CoolMaster-class line, 25–120 kW/unit), “dual-engine triple-mode”2 × 80 kW working for a 6-cabinet row (~126 kW); 3 units installedN+1 (2+1)
OutdoorV-coil dry coolersPeak compressor-mode dutyN+1
ControlCompressor / hybrid / pump free-cooling arbitrationWeather + load drivenGroup control

The chain is deliberately water-free end to end: refrigerant (R410A/R513A class) between indoor units and dry coolers, air everywhere else. WUE ≈ 0. The trade: in hot-humid climates the compressor mode runs longer and annual PUE lands near 1.45 — the northern sites see 1.15–1.25. Both are estimates; site weather data decides.

The power chain

  • Row IT: 6 cabinets × 21 kW = 126 kW. With UPS efficiency 96% and cooling overhead, plan the row feed at 150–160 kVA.
  • One 120 kVA modular power block (30–120 kVA class, hot-swap modules) plus a second for N+1, or one 200 kVA tower unit.
  • Batteries: 10–15 minutes bridging is the default. If the workload tolerates checkpoint-and-pause, 5 minutes cuts battery capex ~40%. Estimate — depends on the generator start contract.

What it costs to be honest

  1. The 10.5 kW/server figure is an estimate. Fan full-speed + PSU redundancy loss can push an OEM build to 11.5 kW; that changes the row from 126 to 138 kW and the dry cooler sizing with it.
  2. Fluorine-pump maximum equivalent pipe length and indoor/outdoor height difference are not in our sources. Vendor confirmation required before the row is placed relative to the plant.
  3. Room-level fail-cold time is unverified. At 21 kW/cabinet, full cooling loss gives roughly 90–120 s before ASHRAE A1 limits are threatened; emergency ventilation sizing must assume it.
  4. The fluorine-pump free-cooling concept is proven at industry scale in the Chinese market (it anchors several vendors’ flagship lines and a 2020 industry standard for evaporative-free-cooling plants); North American reference sites for this specific configuration are scarce. Factor integration risk into the schedule, not just the BOM.

Kill condition

Walk away if the site’s free-cooling hours fall below ~50% (check the wet-bulb histogram, not the average). Below that line the compressor mode dominates, the PUE advantage over a plain DX plant evaporates, and the fluorine-pump premium never pays back — at that point Plan B’s density or a conventional chilled-water plant is the better spend.

Where this fits

The row is the FDC-P40 pod’s air tier at row scale: same power block family, same monitoring layer, same delivery discipline — factory pre-built, craned in, energized in months. The economics inherit the site model: three ways to land a megawatt.