Flare delivers modular AI data centers.

Megawatts,
moved like cargo

Energized in weeks — earning in months

American labor is scarce and power is scarcer. We build complete AI data centers inside standard 40-ft containers — factory-assembled, shipped by truck, running weeks after the pad is poured. The industry calls one of these units a pod; ours is the FDC-P40 — FlareDC Pod, 40-ft. Land one low-voltage feeder, plug in fiber, and your GPUs mint tokens the same quarter: rent now, refi or sell the stabilized asset later. Every quote ships with the per-megawatt math that brochures leave out.

Isometric cutaway: 480V grid feed → pad-mount transformer → transparent FDC-P40 container with racks, busway and 1+1 CDU → dry cooler → tokens out.
Grid in → AI tokens outOpen the anatomy →
6–9 mosignature → AI revenue
$2.8–4.0Mthe asset · per MW·IT
≈$2.9M/yrthe rent · 1.25 MW pod, wholesale scenario
$10k+per MW·day — the wait you skip

Numbers we keep coming back to

The honest math

$3.3–4.9M
Prefabricated modular DC, landed cost per MW of IT load (Hopper → Rubin tiers)
2.3–3.4×
Cost multiple vs US greenfield $11.3M/MW (JLL 2026) — narrows as rack density rises
128–144 wks
Transformer lead times — the real edge of prefab is delivery certainty, not unit price
$10k+/MW/day
Delay tax on late AI capacity — a 100 MW slip costs on the order of $1B

Figures from our turnkey cost model (Oct 2026) — a three-tier model band (Hopper → Rubin), not the sales quote band ($2.8–4.0M/MW·IT air, on the pod page). The cost reference reconciles the model band, the quote band and the full landed caliber.

The product

FDC-P40 — the turnkey pod

Full specs →

AC

Air-cooled. 350 / 450 / 540 kW of IT in a single-row 18-rack floor plan, 8–30 kW/rack, PUE 1.40–1.50. A 27-rack wind-wall flagship (500–750 kW) follows third-party verification ◐.

LC

Liquid-cooled. 850 / 1,050 / 1,250 kW, 50–132 kW/rack, PUE 1.15–1.20, closed loop — CDU 1+1 whole-unit backup standard. For NVL72-class racks.

3

Customer moves, total. Pour a pad, land one low-voltage feeder, plug in fiber. Power bill the same month, rent the same quarter.

Scenarios · engineering cases

Where the pod wins

All scenarios →

One system, three entrances

Live-ish · the power queue

Where power still says yes

Dallas · ERCOT

42

CAUTION

Houston · ERCOT

43

CAUTION

ASHBURN · PJM

20

AVOID

Santa Clara · CAISO

44.2

CAUTION

Phoenix · WECC

43.5

CAUTION

Chicago · PJM

21.9

AVOID

ATLANTA · SOCO

20.7

AVOID

DCPI power-availability composite (0–100) for seven flagship US markets — DCPI 42/100 — CAUTION format. Composite is a modeled estimate (medium confidence, 2026-11-01); sub-scores and exact MW are pro-tier. Pipeline bands: TX 10–50 GW · VA 1–5 GW · CA 500 MW–1 GW. Data: DC Hub DCPI, CC-BY-4.0, updated 4×/day. Verdict = outlook for new power in that market, not market quality.

On the record

Latest briefs

The library →

The company

Who we are

About →

FlareDC builds modular AI data centers — complete FDC-P40 pods engineered against a published specification book, shipped by truck, and energized in weeks. Based in Houston, TX, we hold one layer — the infrastructure — and put the per-megawatt math on the record in every quote.

What you see is what we can defend: model bands, vendor-verified specifications and planning scenarios, each labeled. The binding configuration is set per order in the technical agreement.

More about the company

Next step

Quote in three questions

Contact →

Servers

What servers? 2U/4U air-cooled → AC version. NVL72-class or cold-plate → LC.

Power

What power do you hold? 380/480 V → direct-in. Only MV → transformer variant, priced up front.

Tier

What tier? Default ≈ Tier I, liquid plants 1+1 by default. Tier II–III itemized in writing.