Product brief

FDC-P40-AC: The Air-Cooled Container, Spec'd

2026-10-31 · Product brief · FlareDC

The air-cooled container is one of the two products in our container line. The line is deliberately two products, not three: air and liquid. Hybrid dual-source plants exist in the industry and appear in our three-chain analysis — as analysis. We don’t sell one: two clean products cover the density field, and a hybrid is two products’ worth of capex for a problem most sites don’t have.

Platform (FDC-P40-AC), two geometries [canon, spec book §2.2]:

  • AC-std (standard): 40-ft high-cube, LV direct-in, single row of 18 IT positions (+2 network). The cooling plant is external — rooftop DX / fluorine-pump outdoor units or a ground skid — so floor positions stay IT (real-machine precedent: a vendor’s BC-class container ships ~10–12 racks + 3 rooftop units [fact]). Cooling: smart DX N+1 (PUE 1.40–1.50) or the fluorine-pump free-cooling variant (PUE 1.15–1.45 by climate, [est.]).
  • AC-WW (flagship, ◐ pending verification): back-to-back 27 positions (25 IT + 2 network), no cold aisle, wind-wall pressurization. The 45 kW/rack wind-wall figure is a vendor claim ◐ with third-party corroboration but no full-container precedent — the 750 kW top tier opens for reservation only after independent verification. Standard-shipping-container external dimensions are unchanged either way (40HC bookable as cargo).

No water in the white space in either geometry. Delivery 6–9 months signature-to-power [canon].

The heat-rejection plant is the constraint — read this first

The air box’s floor plan is not its capacity. On AC-std the plant lives outside the box: ~480 kW installed cooling (6 × 80 kW DX with N+1 → ~400 kW usable, or 4 × 120 kW fluorine-pump outdoor units + V-coil dry coolers), mounted rooftop/skid so no IT position pays for it. The ceiling that remains is the box’s total heat-rejection budget (~0.4 MW class) — air changes, leakage, and the thermal path from rack faces to the outside. That is why recent market data is right: air-cooled containers rarely deliver 500 kW of AI fill — the physics lands a 40-ft air box at ~380–400 kW for dense GPU fills. Industry cross-check: Huawei’s FusionModule2000 ships ~180 kW/module and FusionDC1000B ≤264 kW (12 kW/rack dual-side) — 170–300 kW is the shipping norm; our 0.4 MW class sits at the optimistic top of it (denser racks + 120 kW fluorine-pump units). Full heat-rejection estimate with the airflow and rejection chain: docs/pod-research/05-thermal-estimate.md in the project repo. The AC-std tiers are 350/450/540 kW — the electrical options on an 18-IT floor plan (18 × 20/25/30); the 500/600/750 tiers belong to AC-WW and inherit its pending-verification status.

The two chip configurations

Same box, two factory configurations. The chip changes the rack load; the cooling plant changes the rack count.

AC + H200AC + B300
ServerHGX H200 8-GPU (6U–8U chassis), ~10.5 kW [est.]HGX B300 air node (~10U), ~13 kW [est.] — ships air-cooled from four OEMs since 2025-03 memo
GPU TDP700 W [fact]1,400 W [fact] (air node: board-trimmed, airflow-assisted)
Servers / rack22
Rack load21 kW26 kW
IT racks available18 of 18 IT (cooling plant external)15 of 18 (heavier racks)
Container IT~380 kW~390 kW
GPUs per container288240
Design PUE1.40–1.50 (DX) / 1.15–1.25 (FC, cool climate) [est.]same
Utility feed at PUE 1.45~0.55 MVA~0.57 MVA

Why the GPU count drops with B300: same two-servers-per-rack plan, but each rack runs hotter (26 vs 21 kW) against the same ~400 kW usable cooling — so fewer racks carry IT. The air box is the boring, bankable ~400 kW class. For per-container GPU density, that’s what the liquid container is for.

Choose this box when

  • Your GPUs are H200-class or air-node B300 and you want the fastest, simplest, most bankable path — every component is mature hardware, nothing waits on a roadmap.
  • The site has LV power (480 V US / 380-400 V CN) and no chilled-water plant to exploit.
  • You want water out of the machine hall entirely — both AC variants are dry.

Kill condition

Walk away from the fluorine-pump FC variant if the site’s free-cooling hours fall below ~50% (wet-bulb histogram, not annual average) — the compressor mode then dominates and the FC premium never pays back; take plain DX. Walk away from the air container entirely if your GPUs are NVL72-class or you need >30 kW/rack sustained — that’s the liquid container.

Working paper for the H200 configuration: /solutions/modular-air-h200/. Estimate math: /solutions/container-dc-estimator/.

← The FDC-P40 platform