Tech Field anatomy
The 1.2 MW liquid-cooled container
01 Follow the heat
The reading order is the coolant's path. Cold plates inside each rack capture about 90% of the heat into a PG25 loop; the warm return collects along the front of the row into an in-row CDU; the CDU pumps it out through the end wall to two dry coolers in series, and the cooled supply comes back over the rear header. Roughly 10% of the heat never enters the liquid loop and leaves by air.
Drag the load slider: every number on the figure — IT load, loop heat, flow, return temperature — is derived from one model object driven by that single variable. Nothing on the page is a hand-written label.
02 The colour is the code
Six colours, six subsystems, no legend to memorise: graphite is the rack row (the heat source), blue the cold supply, amber the warm return (about 10 K hotter), teal the CDU, slate the power section at the row end, and copper the 480 V busbar running the length of the roof.
Why liquid for this box and not another DX unit? The form factor decides: this container hosts NVL72-class racks whose 1,400 W silicon is liquid-only — the boundary, the numbers, and the case for staying air-cooled where you can are in Air-Cooled B300 Is Not a Compromise.
03 Where the numbers come from
| Value | Figure | Kind |
|---|---|---|
| Rack power | 136 kW/rack | Representative — Supermicro band 132–140 kW |
| Rack composition | 72 GPUs, 8 racks | Vendor — GB300 NVL72 datasheets |
| Liquid share | ≈90% of heat | Judgment — rack-level cold-plate capture |
| Flow coefficient | 1.5 L/min per kW | Vendor — CDU requirement (Dell IR7000) |
| Supply / return | 34 / 44 °C (ΔT 10 K) | Design point, PG25, warm-water band |
| PUE | 1.2 | Planning judgment — annualized; summer design day is worse |
| CDU | 1.8 MW-class in-row | Vendor option class, not a model number |
| Dry coolers, UPS | 2 × series / 1,200 kW | Box-level sizing, not a vendor selection |
Field data pending. These are reference values so the anatomy is
checkable today; nameplate and as-built figures from supplier visits will replace
them. The MODEL object at the top of
tools/fig-liquid-container/build.mjs is the only place numbers live —
swap values there and rebuild.