The 1.2 MW liquid-cooled container

One box · 8 × GB300 NVL72 · 1,088 kW IT · 576 GPUs · cut away

01 Follow the heat

The reading order is the coolant's path. Cold plates inside each rack capture about 90% of the heat into a PG25 loop; the warm return collects along the front of the row into an in-row CDU; the CDU pumps it out through the end wall to two dry coolers in series, and the cooled supply comes back over the rear header. Roughly 10% of the heat never enters the liquid loop and leaves by air.

Drag the load slider: every number on the figure — IT load, loop heat, flow, return temperature — is derived from one model object driven by that single variable. Nothing on the page is a hand-written label.

02 The colour is the code

Six colours, six subsystems, no legend to memorise: graphite is the rack row (the heat source), blue the cold supply, amber the warm return (about 10 K hotter), teal the CDU, slate the power section at the row end, and copper the 480 V busbar running the length of the roof.

Why liquid for this box and not another DX unit? The form factor decides: this container hosts NVL72-class racks whose 1,400 W silicon is liquid-only — the boundary, the numbers, and the case for staying air-cooled where you can are in Air-Cooled B300 Is Not a Compromise.

03 Where the numbers come from

ValueFigureKind
Rack power136 kW/rackRepresentative — Supermicro band 132–140 kW
Rack composition72 GPUs, 8 racksVendor — GB300 NVL72 datasheets
Liquid share≈90% of heatJudgment — rack-level cold-plate capture
Flow coefficient1.5 L/min per kWVendor — CDU requirement (Dell IR7000)
Supply / return34 / 44 °C (ΔT 10 K)Design point, PG25, warm-water band
PUE1.2Planning judgment — annualized; summer design day is worse
CDU1.8 MW-class in-rowVendor option class, not a model number
Dry coolers, UPS2 × series / 1,200 kWBox-level sizing, not a vendor selection

Field data pending. These are reference values so the anatomy is checkable today; nameplate and as-built figures from supplier visits will replace them. The MODEL object at the top of tools/fig-liquid-container/build.mjs is the only place numbers live — swap values there and rebuild.

04 Keep reading

The per-megawatt cost math behind this box — and the honest counterpoint — is in The Real Cost of a Modular Megawatt, and the price of delivering late in Power Is the Asset. The electrical side of the same building — substation to busway, cabinet by cabinet — is dissected in The Power Chain.