The layer we hold
American labor is scarce and power is scarcer. Grid queues run years, transformers run quarters, and every month of delay on AI capacity costs more than the equipment does. FlareDC exists for one reason: speed is a product, and the way to manufacture it is to build data centers the way factories build everything else — on a production line, not a job site.
We deliver the FDC-P40: a 40-ft container with low-voltage power, distribution, racks, cooling and monitoring factory-installed. The customer pours a pad, lands one feeder, plugs in fiber. Six to nine months from signature to a power bill — against a five-year interconnection queue — is the entire business case, and we publish the arithmetic behind it rather than a brochure.
01 The supply chain is the moat
Prefab only wins if the factory can actually ship. We hold the chain end to end — container fabrication, low-voltage switchgear, rack integration, cooling skids, monitoring — with locked production slots and locked pricing, and every component in the BOM is mature 2026 hardware. Nothing in our product waits on a 2028 roadmap; the 800-volt generation is designed in as an upgrade track, not a dependency.
Unit-price honesty, per our own cost model: offshore prefab lands at roughly the same per-MW as US construction at scale. The edge is delivery certainty — and the delay tax it avoids is worth more than the discount anyone advertises.
02 How we make money — and how we don't
We hold the infrastructure layer: rent from energized capacity, plus build-to-sell exits when pricing allows. We do not own GPUs. The October 2026 market repricing made the reason plain — when bond yields hit 15%, the leveraged GPU owner refinances into the shock and the rent-collector survives it. Our leases are take-or-pay; our tenants carry the silicon.
Every engagement runs through the same model we run our own capital through, with kill conditions stated up front — see the three engagement paths. We turn down work priced on the bull case.