Tech Modular anatomy

One floor, three cooling chains

Air · Liquid · Dual-source — one model, three density bands, two reference builds

A modular data center is not one cooling technology — it is three chains sharing one floor. Air-cooled rows carry the generic load, cold-plate rows carry the dense GPU load, and a dual-source plant room arbitrates between them as weather and workload move. Decomposing a working three-zone demo model (industry booth, Oct 2026) gave us the topology on this page: the same color code, the same four heat-transfer interfaces, the same honest gaps.

The rule the model teaches: pick the chain by cabinet density, not by fashion. Below ~25 kW/cabinet, air with free-cooling wins on TCO. Above ~40 kW/cabinet, cold plates are the only game in town — 1,400 W-class GPUs are liquid-only. Between the two, a dual-source plant avoids buying two independent systems for one room.

The density ladder: air 8-30 kW/rack, cold plate 50-132 kW/rack, two-phase immersion 80-130+ kW/rack (reference tier, not shipped) — bands from spec book section 3.2, measurements from IEEE TCPMT 2021 and Applied Thermal Engineering 2022
The density ladder — tiers 1–2 ship, tier 3 is the watchlistAnchors & DOIs →

PUE, honestly

Containerized ≠ inefficient

The industry instinct says prefab means thermal compromise. Our design PUE bands say otherwise: air DX 1.40–1.50, fluorine-pump free cooling 1.15–1.45 est., liquid 1.15–1.20 — every band sits below the ~1.56 global average from Uptime Institute's survey [fact]. The mechanism is structural, not marginal: a sealed box has cold/hot aisles fully contained, airflow paths measured in meters instead of tens of meters, factory-injected sealing instead of field leakage, adiabatic dry coolers outside — and the AIOps layer tuning setpoints continuously [DOI].

Band provenance: FC band from the vendor's VFV free-cooling line (manual p21) ◐; vendor qualitative claim "fully sealed, low PUE" (brochure p51) ◐; academic anchors [global PUE trajectory] · [fair-comparison indicator]. Design PUE is a band, not a guarantee — the guarantee lives in the technical agreement.

01 Follow the heat — the four interfaces

The color code is the model's own, and it is the reading order: blue carries cool toward the load (supply water, refrigerant, or aisle air), red carries heat back, amber/green carry the refrigerant loop between the CDU and the dry coolers. Every color change is a heat-transfer interface, and each one has a temperature drop and an efficiency cost:

silicon → cold plate (or fin) → loop / aisle → CDU heat exchanger → dry cooler coil → air. Fewer interfaces is not automatically better: the air chain has the same four interfaces but moves them meters away from the chip, which is exactly why it tops out near 25 kW/cabinet while the liquid chain, moving the first interface centimeters from the die, clears 60.

02 The same floor in 3D

Same topology, orbitable. Click a zone (or the buttons) to focus it; the readout carries each chain's density band and the honest caveats. Drag to orbit, scroll to zoom.

03 The selector: density picks the chain

Slide your per-cabinet IT load. The recommendation flips at the physics boundaries, not at marketing boundaries:

5 kW21 kW/cabinet80 kW

04 Two container products × two chips = four configurations

The product line is two containers, deliberately not three: air and liquid. The dual-source plant (Zone C above) stays in this page as analysis of the demo model — we don't sell it. Each container takes two factory chip configurations, and the chip changes the math inside the box: rack load in the air box, rack count in the liquid box, where the CDU bay eats floor space.

FDC-P40-AC — the air-cooled container · AC-std: single-row 18 IT, external cooling plant · AC-WW wind-wall 27-position flagship ◐ pending verification · no water anywhere
FDC-P40-LC — the liquid-cooled container · 10–14 racks + CDU bay · cold plates → fluorine-to-water CDU → dry coolers · WUE ≈ 0

ConfigurationServers/rackkW/rackIT racks usedContainer ITGPUs/container
AC + H200 (700 W `[fact]`)22118 of 25 — cooling plant takes 4–6~380 kW288
AC + B300 (air node, ~13 kW `[est.]`)22615 of 25~390 kW240
LC + H200 (8U chassis)552.512 of 14630 kW480
LC + H200 (6U chassis)66312 of 14756 kW576
LC + B30045514 of 14770 kW448

How to read it — each box is bound by a different constraint: the air container's floor plan says 25 racks, but its heat-rejection plant (~480 kW installed: 6 × 80 kW DX or 4 × 120 kW fluorine-pump indoor units, N+1) consumes 4–6 rack positions and caps IT at ~380–400 kW — exactly why market data shows air containers rarely reaching 500 kW. The liquid container swaps 13 rack positions for a 1+1 whole-unit CDU bay (2×700–850 kW pairs), so IT lands at 630–770 kW. And servers-per-rack is a chassis-height fact before it is a thermal one: 42U holds 5 × 8U nodes or 6 × 6U — which is why cold-plating the 700 W H200 into a 6U chassis yields the density sleeper of the line: 576 GPUs in one 40-ft box. NVL72-class rack-scale systems are an LC variant (9–10 racks fill an LC-1,250), priced separately.

GPU TDPs: NVIDIA public specs `[fact]`. Per-server input power and per-container arithmetic are `[est.]` pending selected-OEM nameplates — same confidence discipline as everywhere on this site.

05 What the demo model doesn't show

Honesty section, because a spec without gaps is a pitch: the physical model this page decomposes shows no redundancy topology (LED animation runs a single path; real rows are N+1), no monitoring layer (DCIM, leak detection, access control are absent), and no fire suppression. The fluorine-pump units' maximum pipe runs and the CDU's acoustic rating are not published in our sources — both are open items in the working papers. Full critique: Plan A and Plan B carry per-item confidence labels.

Working papers (project repo, docs/pod-research/): 01 model anatomy · 02 cooling-approach critique · 03 page-pattern critique · 04 market notes · 00 deliverables map & changelog. The pages and the papers are one deliverable.

Get a quote — tell us your kW/cabinet