This is the chain the FDC-P40 plugs into — and, when the site only has medium voltage, the chain we have to build first. The interactive cutaway opens every cabinet: the medium-voltage distribution stage, the oil-filled padmount transformer (34.5 kV → 415/480 V is the US campus norm — the dry-type-in-a-container version is a common drawing error), the low-voltage incomer with its ACB, the bus tie with its transfer logic, the feeder columns, and the UPS / IT load at the end of the line.
The lesson that matters for a pod buyer is the one about where intelligence lives. Every cabinet carries its own smart unit — metering, protection, control — and protection trips locally, in the cabinet, whether or not the supervisory layer is reachable. SCADA sits above the chain as a unified view: alarms, event sequences, remote operation with interlocks. Intelligence is distributed; the view is unified. Any proposal that routes tripping through a supervisory server is a design error, not a feature.
Click any cabinet for its smart unit, meters, and vendor pool. E explodes the chain; S switches between US (34.5 kV → 415 V) and CN (10 kV → 400 V) standards.
The same chain drawn the way a commissioning engineer sketches it — an isometric cutaway that starts one stage further up, at the campus substation (345 kV in, 34.5 kV distributed across the park; the public reference case is the Stargate Abilene build-out), and makes the supervisory layer physical: the SCADA / PTMS bus is drawn as what it actually is — a blue communication line dropping into every cabinet's smart unit, not a box in the corner. Click a cabinet for its smart unit, metering points, and vendor pool; click the SCADA layer for what the supervisory system does — and, just as important, what it must not do (it never replaces local protection). The right panel also carries the PTMS scope warning: align what the acronym covers — cooling? UPS? fire? — before signature.
Where the pod begins: the LV incomer is FDC-P40's first cabinet. If your site already has 380/480 V service, everything left of the pod is somebody else's civil works — that is the entire point of low-voltage direct-in. If it only has medium voltage, the pad-mount or transformer-bay variant covers the first two stages, priced before signature. The cooling side of the chain is dissected separately in the liquid-cooling container cutaway.