Scenario Engineering case · liquid training
B300 liquid
training pod
The case: you're buying cold-plate B300 — or planning the NVL72-class refresh behind it — and you need training capacity in months, not queue-years. The site holds low-voltage power; the county is fighting over water permits; your operators can hold a leak-discipline regime. That's the whole checklist for this scenario.
What's inside · products
Product
FDC-P40-LC — the liquid-cooled container: 10–14 racks, CDU bay, factory cold-plate loop, UQD quick-disconnects.
Accessories
MPO fiber trunks, 800G optics (per server QVL), PDC/busway, the 1+1 CDU pair — one PO, one FAT/SAT pack.
Money
$4.0–5.7M/MW·IT landed, duties included (before duties $3.2–4.7M) — liquid bands include the 1+1 CDU pair.
Tech behind · technology
Technology
Three cooling chains — why the back-to-back liquid layout doubles rack density, with the interactive SVG + 3D.
Technology
Liquid field anatomy — chip → cold plate → CDU → dry cooler, every interface labeled with sources.
Roadmap
800 VDC / SST upgrade track — the power bay swaps; the container, cooling and monitoring carry forward.
The full brief · on the record
The complete configuration working paper — per-rack chassis heights, tier fill, the density-sleeper 6U variant at 576 GPUs, and why pump-level redundancy alone was a Tier I weakness until the 1+1 commitment — is the liquid B300 solution brief. The product spec lives on the FDC-P40-LC page; every figure traces to the references library.
Kill condition: if your operations team cannot hold the leak-discipline regime (log every mate/demate, weekly sensor checks), walk away from liquid — take the air B300 at half the density in the air-first scenario.