Scenario Engineering case · liquid training

B300 liquid
training pod

Cold-plate B300 · one 40-ft box · zero process water

Liquid-cooled rack with cold-plate B300 servers, blue supply and warm return manifolds, 1+1 CDU pair and dry cooler

The case: you're buying cold-plate B300 — or planning the NVL72-class refresh behind it — and you need training capacity in months, not queue-years. The site holds low-voltage power; the county is fighting over water permits; your operators can hold a leak-discipline regime. That's the whole checklist for this scenario.

448
GPUs per container (4 × 10U B300 nodes × 14 racks)
770 kW
Container IT — sits in the LC-850 tier
2×850 kW
CDU (1+1) — one survivor carries the full load ×1.1 [canon]
WUE ≈ 0
Closed PG25 loop, dry coolers — fully dry by default

What's inside · products

Tech behind · technology

The full brief · on the record

The complete configuration working paper — per-rack chassis heights, tier fill, the density-sleeper 6U variant at 576 GPUs, and why pump-level redundancy alone was a Tier I weakness until the 1+1 commitment — is the liquid B300 solution brief. The product spec lives on the FDC-P40-LC page; every figure traces to the references library.

Kill condition: if your operations team cannot hold the leak-discipline regime (log every mate/demate, weekly sensor checks), walk away from liquid — take the air B300 at half the density in the air-first scenario.

Size this scenario for your site Compare the air-first case