Solution brief
Plan B — The B300 Liquid-Cooled Row, Spec'd
This is the working paper for Plan B of the three-chain modular floor: a liquid-cooled row built around the NVIDIA HGX B300 8-GPU server. Companion paper: Plan A — the H200 air-cooled row.
Product layer: this is the per-chip working paper. The shippable product is the FDC-P40-LC liquid-cooled container (both chip configs, per-container GPU counts).
Working papers (project repo):
docs/pod-research/02-cooling-approaches-review.md§3 (sizing derivation), §3.6 (open items),01-model-anatomy.md(topology source). The web page and the papers are one deliverable — the papers carry the confidence labels the page summarizes.
The load
- NVIDIA B300 (Blackwell Ultra): 1,400 W TDP per GPU (NVIDIA public spec). 8 GPUs = 11.2 kW. 288 GB HBM3e each.
- Whole-server input: ~13.5 kW (CPUs, memory, NICs, PSU loss). Estimate — confirm against the selected OEM build.
- Deployment: 4 servers per cabinet = ~55 kW IT/cabinet. Scale reference: NVIDIA’s GB300 NVL72 rack (~135–140 kW, fully liquid-cooled) runs the same silicon at 2.5× our density — this row is deliberately the conservative end of liquid.
- Secondary-loop water at ΔT 12 K: 55 kW ÷ (4.186 × 12) ≈ 1.1 L/s per cabinet, supply 32 °C / return 44 °C class (warm-water cold plate).
The cooling chain (Zone B)
| Layer | Equipment | Sizing | Redundancy |
|---|---|---|---|
| Server | Cold plates on GPU + CPU, quick-disconnects | 13.5 kW/node | Leak detection: rope + point |
| Cabinet | Vertical manifolds, row loop | 1.1 L/s/cabinet, ΔT 12 K | Dual supply/return |
| Row | CDU, refrigerant-to-water | 2 × 400 kW serving the ~440 kW row (~55% loading each) | Resolved 2026-11-02 (grill G2): whole-unit 1+1 committed product-wide — survivor carries full IT ×1.1; the working-paper 2×400 rows are historical pre-decision figures |
| Outdoor | Dry coolers on the refrigerant loop | Peak duty ~800 kW | N+1 |
| Control | Shared plant control with Zone A/C | — | — |
Why the primary side is refrigerant, not water: the CDU isolates the IT loop from the outdoor loop. With a refrigerant primary, nothing in the white space can leak process water — WUE ≈ 0, no water treatment plant, no permit line item. The cost is ~20–30% more heat-exchange area outdoors. Where the site already owns a chilled-water or tower plant (retrofits), swap to the water-to-water CDU variant and the capex drops — the row design is otherwise unchanged.
The power chain
- Row IT: 8 cabinets × 55 kW = 440 kW. PUE est. 1.10–1.20 → utility draw ~510 kVA.
- Modular power blocks: 5 × 120 kVA working + 1 N+1 (600 kVA working against a ~510–530 kVA draw). 96%-efficiency class UPS.
- The row leaves 10–15% of floor load air-cooled (network, storage, management) — those cabinets sit in Zone A and share the same outdoor plant under the dual-source control. One plant room, two chains.
What it costs to be honest
- Cold-plate pressure-drop and flow curves are OEM data we don’t hold. The 1.1 L/s figure is the loop-level requirement, not a guarantee any specific plate meets it quietly.
- Quick-disconnect endurance (dripless mate/demate cycles) is a spec to demand in writing — MGX-class hardware targets ≥50 cycles; verify.
- CDU acoustics and refrigerant charge class (R513A/R1234ze) affect permitting in some jurisdictions; unresolved in our sources.
- The liquid chain’s physics is settled; the supply chain is the risk — CDUs, manifolds and dripless fittings have lead times measured in quarters, and import duties are priced into our pod economics, not discovered later.
- Dry-cooler nameplate is a cool-climate rating. At 42 °C Texas ambient on a glycol loop, the same hardware delivers roughly ~69% of nameplate — sizing must be written as the triple (water temperature, ambient, glycol), never as bare kW. Estimate pending vendor curves. The Texas-appropriate plant is 3–4 large adiabatic V-coil units (3+1, ~80–120 m²), not a dozen small parallel ones (hydraulic balancing); ~63.5 dB(A) at 10 m wants real setback or screening. See the working-paper audit:
docs/museReview.md§1.7. - Ride-through on a warm-water loop is seconds, not minutes. Industry references (ASHRAE TC 9.9, third-party): a CDU pump loss can reach processor throttling in as little as ~23 s — faster on GPUs, and ~2 s at 45 °C supply. That is why unit-level CDU redundancy is the colo expectation line (Uptime Tier III), and why the sizing decision disclosed in the table above is a real gate, not paperwork. Third-party figures, ◐.
Kill condition
Walk away if the operating team cannot hold leak-discipline. Cold-plate liquid cooling is a maintenance regime, not a product: log every mate/demate, test every rope sensor, keep the spill kits stocked. A team that won’t sign up for that will eventually find out what 55 kW/cabinet does to a floor when a manifold lets go — at that density there is no graceful version of the failure. For those teams, Plan A or a conventional DX row is the honest answer.
Where this fits
This row is the FDC-P40 pod’s liquid tier at row scale — 850–1,250 kW IT per 40-ft unit, 50–132 kW/rack. The delivery economics, the tariff treatment and the site verdicts carry over unchanged; only the chain inside the box changes.